Dozens of Buildings Left Without Heating in Viciebsk at −20°C

In Viciebsk, due to a rupture of a heating main, dozens of residential buildings, kindergartens and industrial facilities were left without heating and hot water overnight from Friday to Saturday. Temperatures of −18°C to −20°C are expected in Viciebsk overnight.

An accident occurred on a section of a heating network with a diameter of 700 mm in the area of Horkaha Street. The heat carrier leak was detected by personnel of the Viciebsk district heating networks, Vitebskenergo reported.

Heating and hot water are unavailable at the following addresses:

Residential buildings on 1st Praletarskaya Street: 3, 5, 7, 7-1, 12, 13, 15, 20, 17/2, 22;
Residential buildings on M. Horkaha Street: 57, 57B, 59A, 59B, 61, 63, 65, 67/1;
Residential buildings on Vastratsova Street: 1, 3, 3-1, 5, 5-1, 7-1, 7-2, 9-1, 9-2, 11, 13;
Residential buildings on 4th Pryadilnaya Street: 1, 3/30, 4, 5, 6/32;
Residential building on 2nd Praletarskaya Street: 34;
Residential buildings on Yamskaya Street: 10, 10-1;
Dormitory on Horkaha Street: 57A;
Private residential building on Yamskaya Street: 7A;
Private residential building on 4th Pryadilnaya Street: 4;
Kindergarten No. 67 on 4th Pryadilnaya Street: 2;
Kindergarten No. 75 on Vastratsova Street: 3A;
Children’s School of Arts No. 1 on Horkaha Street: 59H;
Secondary School No. 23 on Horkaha Street: 61A;
Administration of the Piershamaiski District on 1st Praletarskaya Street: 14;
MegaEurotex private unitary enterprise on Horkaha Street: 62;
Dubl-MK on Horkaha Street: 62-2B;
Production facility of Rubikon LLC on Horkaha Street: 62B;
Viciebsk Regional Department of GosPromNadzor on Vastratsova Street: 2;
Water intake facility No. 2 on Horkaha Street: 62;
Housing Maintenance Enterprise of Viciebsk on 1st Praletarskaya Street: 18;
Law and Order facility on Horkaha Street: 59;
Shop No. 137 on Vastratsova Street: 12;
Shop No. 131 on 1st Praletarskaya Street: 8;
Settlement Centre No. 2 of the Housing Maintenance Enterprise on 1st Praletarskaya Street: 10;
Social and Pedagogical Centre on 1st Praletarskaya Street: 16.

Repair work will continue throughout the night. Hot water supply and heating are expected to be restored on the morning of January 31.

“On the evening of January 30, an inspection of the damaged section was carried out, as well as earthworks and preparatory measures to organise устранение the defect in order to minimise the duration of the heat supply outage for consumers. Around midnight, energy workers began disconnecting the heat supply and preparing for welding work to replace the damaged section of the heating network,” Vitebskenergo reported.

🔥 Support Reform.news with a donation!