Фото: t.me/Minenergo_by
The second power unit of the Belarusian Nuclear Power Plant (BelNPP) has been reconnected to the electricity grid, the plant’s press service said.
The unit was reconnected at 7:45 a.m. on Aug. 4 after diagnostic work on electrical equipment had been completed.
The unit had been disconnected from the grid on July 26.