{"id":519592,"date":"2026-02-20T17:09:15","date_gmt":"2026-02-20T14:09:15","guid":{"rendered":"https:\/\/reform.news\/?p=519592"},"modified":"2026-02-21T12:38:44","modified_gmt":"2026-02-21T09:38:44","slug":"working-agreement-on-construction-of-third-unit-at-belarusian-nuclear-power-plant-planned-by-year-end","status":"publish","type":"post","link":"https:\/\/reform.news\/en\/working-agreement-on-construction-of-third-unit-at-belarusian-nuclear-power-plant-planned-by-year-end","title":{"rendered":"Working Agreement On Construction Of Third Unit At Belarusian Nuclear Power Plant Planned By Year-End"},"content":{"rendered":"<div id=\"fb-root\"><\/div>\n<p>Belarus and Russia plan to sign a working agreement by the end of 2026 on the construction of a third power unit with a capacity of 1,200 MW, the Belarusian Energy Ministry reported. The document is being prepared jointly with Rosatom.<\/p>\n<p>In parallel, plans for a second nuclear power plant are being considered. The ministry named the Mahilyow region as the most promising site. The new capacity is being designed with projected growth in electricity consumption after 2040 in mind.<\/p>\n<p><em>\u201cIn 2025, the Belarusian Nuclear Power Plant generated 17 billion kWh \u2014 40% of the country\u2019s total electricity output,\u201d<\/em> the ministry said.<\/p>\n<p>It was reported in November last year that a decision had been made to build a third power unit at the Belarusian Nuclear Power Plant site.<\/p>\n<p>Speaking about the prospects of constructing another nuclear power plant in Belarus, <b>Aliaksandr Lukashenka<\/b> expressed hope that he would be able to persuade Russia to build it so that he could earn revenue from electricity sales to Russia\u2019s southwest.<\/p>\n<p>In March last year, addressing Russia\u2019s Federation Council, Lukashenka said that if a second plant were built, he would be able to supply electricity to the Bryansk region and the \u201cnew regions of Russia.\u201d Later, during talks with Putin, Lukashenka said that a plant in eastern Belarus could be built to \u201csupply electricity to territories liberated by Russia \u2014 Kherson, Zaporizhzhia, Luhansk and Donetsk.\u201d<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Belarus and Russia plan to sign a working agreement by the end of 2026 on the construction of a third power unit with a capacity of 1,200 MW, the Belarusian Energy Ministry reported. The document is being prepared jointly with Rosatom. In parallel, plans for a second nuclear power plant are being considered. The ministry [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":508986,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_sharing_image":{"poster":"https:\/\/reform.news\/wp-content\/uploads\/2026\/02\/69997d295ca07.jpg","width":1200,"height":630,"template":"691142dd","mode":"auto"},"_sharing_image_fieldset":{"dTVKfmI95PYT":"Working Agreement On Construction Of Third Unit At Belarusian Nuclear Power Plant Planned By Year-End"},"footnotes":""},"categories":[142338],"tags":[],"class_list":["post-519592","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"wps_subtitle":"","_links":{"self":[{"href":"https:\/\/reform.news\/en\/wp-json\/wp\/v2\/posts\/519592","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/reform.news\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/reform.news\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/reform.news\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/reform.news\/en\/wp-json\/wp\/v2\/comments?post=519592"}],"version-history":[{"count":0,"href":"https:\/\/reform.news\/en\/wp-json\/wp\/v2\/posts\/519592\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/reform.news\/en\/wp-json\/wp\/v2\/media\/508986"}],"wp:attachment":[{"href":"https:\/\/reform.news\/en\/wp-json\/wp\/v2\/media?parent=519592"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/reform.news\/en\/wp-json\/wp\/v2\/categories?post=519592"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/reform.news\/en\/wp-json\/wp\/v2\/tags?post=519592"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}