{"id":513850,"date":"2026-01-31T10:43:09","date_gmt":"2026-01-31T07:43:09","guid":{"rendered":"https:\/\/reform.news\/?p=513850"},"modified":"2026-01-31T13:05:10","modified_gmt":"2026-01-31T10:05:10","slug":"heat-restored-to-homes-in-vitsyebsk-after-accident-fixed","status":"publish","type":"post","link":"https:\/\/reform.news\/en\/heat-restored-to-homes-in-vitsyebsk-after-accident-fixed","title":{"rendered":"Heat Restored to Homes in Vitsyebsk After Accident Fixed"},"content":{"rendered":"<div id=\"fb-root\"><\/div>\n<p>Heat supply has been restored to all previously disconnected consumers in Vitsyebsk, Vitebskenergo reported.<\/p>\n<p>The damage to a section of the heating network was discovered the day before by specialists from the Vitebsk Heating Networks branch on Maksim Gorky Street. Dozens of residential buildings, kindergartens, and industrial facilities were left without heating and hot water on the night from Friday to Saturday.<\/p>\n<p>Repair work was carried out overnight. The damaged section of the pipeline was dismantled and replaced with a new one. The repair was completed at 08:10.<\/p>\n<p><i>\u201cAt present, the pipeline is being filled with network water, after which heat supply to disconnected consumers will be restored,\u201d<\/i> the statement said.<\/p>\n<figure id=\"attachment_513776\" aria-describedby=\"caption-attachment-513776\" style=\"width: 900px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/reform.news\/wp-content\/uploads\/2026\/01\/photo_2026-01-31_09-02-08.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-513776 size-full\" src=\"https:\/\/reform.news\/wp-content\/uploads\/2026\/01\/photo_2026-01-31_09-02-08.jpg\" alt=\"\" width=\"900\" height=\"1200\" srcset=\"https:\/\/reform.news\/wp-content\/uploads\/2026\/01\/photo_2026-01-31_09-02-08.jpg 900w, https:\/\/reform.news\/wp-content\/uploads\/2026\/01\/photo_2026-01-31_09-02-08-225x300.jpg 225w, https:\/\/reform.news\/wp-content\/uploads\/2026\/01\/photo_2026-01-31_09-02-08-768x1024.jpg 768w, https:\/\/reform.news\/wp-content\/uploads\/2026\/01\/photo_2026-01-31_09-02-08-300x400.jpg 300w, https:\/\/reform.news\/wp-content\/uploads\/2026\/01\/photo_2026-01-31_09-02-08-600x800.jpg 600w\" sizes=\"auto, (max-width: 900px) 100vw, 900px\" \/><\/a><figcaption id=\"caption-attachment-513776\" class=\"wp-caption-text\">Photo: t.me\/vitenergo<\/figcaption><\/figure>\n<figure id=\"attachment_513774\" aria-describedby=\"caption-attachment-513774\" style=\"width: 1200px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/reform.news\/wp-content\/uploads\/2026\/01\/photo_2026-01-31_09-02-08-2.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-513774 size-full\" src=\"https:\/\/reform.news\/wp-content\/uploads\/2026\/01\/photo_2026-01-31_09-02-08-2.jpg\" alt=\"\" width=\"1200\" height=\"900\" srcset=\"https:\/\/reform.news\/wp-content\/uploads\/2026\/01\/photo_2026-01-31_09-02-08-2.jpg 1200w, https:\/\/reform.news\/wp-content\/uploads\/2026\/01\/photo_2026-01-31_09-02-08-2-300x225.jpg 300w, https:\/\/reform.news\/wp-content\/uploads\/2026\/01\/photo_2026-01-31_09-02-08-2-768x576.jpg 768w, https:\/\/reform.news\/wp-content\/uploads\/2026\/01\/photo_2026-01-31_09-02-08-2-533x400.jpg 533w, https:\/\/reform.news\/wp-content\/uploads\/2026\/01\/photo_2026-01-31_09-02-08-2-1067x800.jpg 1067w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><\/a><figcaption id=\"caption-attachment-513774\" class=\"wp-caption-text\">Photo: t.me\/vitenergo<\/figcaption><\/figure>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Heat supply has been restored to all previously disconnected consumers in Vitsyebsk, Vitebskenergo reported. The damage to a section of the heating network was discovered the day before by specialists from the Vitebsk Heating Networks branch on Maksim Gorky Street. Dozens of residential buildings, kindergartens, and industrial facilities were left without heating and hot water [&hellip;]<\/p>\n","protected":false},"author":119,"featured_media":513849,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_sharing_image":{"poster":"https:\/\/reform.news\/wp-content\/uploads\/2026\/01\/697dd3dc44620.jpg","width":1200,"height":630,"template":"691142dd","mode":"auto"},"_sharing_image_fieldset":{"dTVKfmI95PYT":"Heat Restored to Homes in Vitsyebsk After Accident Fixed"},"footnotes":""},"categories":[142338],"tags":[],"class_list":["post-513850","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"wps_subtitle":"","_links":{"self":[{"href":"https:\/\/reform.news\/en\/wp-json\/wp\/v2\/posts\/513850","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/reform.news\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/reform.news\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/reform.news\/en\/wp-json\/wp\/v2\/users\/119"}],"replies":[{"embeddable":true,"href":"https:\/\/reform.news\/en\/wp-json\/wp\/v2\/comments?post=513850"}],"version-history":[{"count":0,"href":"https:\/\/reform.news\/en\/wp-json\/wp\/v2\/posts\/513850\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/reform.news\/en\/wp-json\/wp\/v2\/media\/513849"}],"wp:attachment":[{"href":"https:\/\/reform.news\/en\/wp-json\/wp\/v2\/media?parent=513850"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/reform.news\/en\/wp-json\/wp\/v2\/categories?post=513850"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/reform.news\/en\/wp-json\/wp\/v2\/tags?post=513850"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}