Heating supply through the TM-3 main pipeline was shut off in Barysau this morning. As a result, 175 residential buildings, 16 educational institutions, three healthcare facilities and a social services centre were left without heating.
“The shutdown was caused by damage to a section of the heating network operated by the Zhylyo municipal unitary enterprise. An increase in the system’s make-up water supply made it necessary to carry out work to locate and repair the damage,” Minskenergo reported.
Repairs and the restoration of heating services are scheduled to take place today, from 7 a.m. until midnight.